Tesla and SpaceX to build $16.8B Texas chip fab powered by natural gas
Tesla and SpaceX confirmed their Terafab semiconductor megafactory will be built in Grimes County, Texas with a first-phase cost of $16.8 billion, but will rely on natural gas power plants rather than Tesla solar to meet its energy needs.
X Bluesky LinkedIn Hacker News Email
Coverage
Primary sources
Related stories
Related coverage
More coverage from around the web
Appeared in: 2026-08-07 (#13)