Data center demand drives 46% jump in PJM wholesale power costs in 2026
The PJM Interconnection's wholesale power costs surged to $56.7 billion through early 2026, with data center loads accounting for 9% of the increase amid broader energy and capacity price pressures.
X Bluesky Threads LinkedIn Email
Coverage
Related stories
More coverage from around the web
Appeared in: 2026-08-27 (#3) · 2026-08-28 (#6)