News

BetaClimate & energy, clustered across 39 sources.

PG&E launches pilot for faster distributed energy interconnection

Pacific Gas & Electric is testing a "customer-driven" flexible interconnection program that could allow larger distributed loads to connect to the grid in months rather than years, addressing a major bottleneck in renewable and storage proj

Coverage

More coverage from around the web

Appeared in: 2026-09-03 (#14)

← Back to the brief