Chilean solar plant remains offline two months after cyberattack
A 103 MW solar facility with 312 MWh of battery storage in northern Chile has been shuttered for two months following a reported cyberattack, with no confirmed details on the attack's nature or restoration timeline.
X Bluesky Threads LinkedIn Email
Coverage
More coverage from around the web
Appeared in: 2026-10-29 (#12)